Here are some examples of the projects performed by Negmax's team. Click on the collapsible items to view more information:
Revolutionizing the Hard-Surfacing Industry: SPRS's Transformation from Conventional to Advanced PTAW Machine
(Click " More on this " to see more details)
Customer:
Plasma Transfer Arc Welding Supplier.
Main Achievements:
Complex geometry processing time cut by 30%, resulting in faster production cycles.
Operations simplified, reducing training required.
Errors related to inability to handle complex geometries eliminated.
Communication between machine and software streamlined, removing redundant data entry.
Resource allocation optimized with less requirement for senior-level intervention.
Material wastage reduced, contributing to cost savings.
Project work included:
Improvement Process "Discover, Implement, Sustain"
Hardware & Mechanical design.
Electrical design.
Software design.
Assembly planning.
Parametric Design and Manufacturing
Prototyping.
From Idea to Manufacturing: Negmax's Journey in Delivering a High-Performance UV Flatbed Printing Machine
(Click " More on this " to see more details)
Customer:
Printing Machines Manufacturer.
Main Achievements:
Complete Hardware & software development of flatbed printing machine containing more than ~4000 Parts, ~2000 electrical connection points, pneumatic & ink delivery system.
Supply chain & procurement planning for all the components including distributed outsourced manufactured parts.
Assembly & inventory planning including multi-level sub-assembly production.
Actual prototyping.
Project work included:
Hardware Mechanical design.
Electrical design.
Software design.
Assembly planning.
ERP planning.
Prototyping.
Revolutionizing Production Processes: Metal Exterior Insulated Panel Manufacturer & Negmax's Success Story
(Click " More on this " to see more details)
Customer:
Metal Exterior Insulated Panel Manufacturer
Main Achievements:
Process time went down to 25% of the original time for foam insulated panels (order specific).
Preparation time reduced by 50%.
Operations now require less labor and significantly less expertise.
Rework reduced to almost zero.
Project work included:
Improvement Process "Discover, Implement, Sustain"
Hardware & Mechanical design.
Electrical design.
Software design.
Parametric Design and Manufacturing
Prototyping.
Streamlining Quotation Generation and Reducing Errors: A Digital Revolution at a Trim Manufacturer.
(Click " More on this " to see more details)
Customer:
Building Trim Manufacturer
Main Achievements:
Quotation time cut by 82% to just 10 minutes.
Simplified operation requires minimal training.
Error-related rework completely eliminated.
Streamlined software communication, no redundant data entry.
Senior-level review needs reduced, freeing up resources.
Project work included:
Improvement Process "Discover, Implement, Sustain"
Software design.
Parametric Design and Manufacturing.
ERP Connection and Streamlining.
Streamlining Operations and Boosting Efficiency: A Success Story with Custom Metal Manufacturer
(Click " More on this " to see more details)
Customer:
Custom Sheet Metal Manufacturer with CNC capability
Main Achievements:
Customer fulfillment time slashed by 50% from 2 days to 1 day.
Engineering time for parts preparation saved by 70% - 90%.
CNC operator's time reduced by at least 50% through automation.
Full automation achieved for the plasma cutting system, improving efficiency and safety.
Significant reduction in the expertise and risks associated with the process.
Project work included:
Improvement Process "Discover, Implement, Sustain"
Hardware & Mechanical design.
Electrical design.
Software design.
Parametric Design and Manufacturing
Prototyping.
To show you more information about our projects and our achievements, Please feel free to book a consultation session and we will discuss your questions further.